Sunday, May 17, 2020

Operations Management Project Synopsis - 1941 Words

TEMPLATE FOR PROJECT SYNOPSIS (The project Synopsis should be of 1000 words and should be less than 5 pages) Name: Roll Number: OPERATIONS Specialization: Contact Number: E Mail: TITLE OF THE PROJECT: A PROJECT REPORT ON STEEL INDUSTRY OF TATA IRON AND STEEL COMPANY NAME AND DESIGNATION OF THE ORGANIZATION GUIDE: VINAYAK PHANSE, AUDIT MANAGER, TATA PROJECTS NAME AND DESIGNATION OF THE ACADEMIC GUIDE: VINAYAK PHANSE, AUDIT MANAGER, TATA PROJECTS 1. INTRODUCTION: The Indian steel industry is more than 100 years old now. The first steel ingot was rolled on16th February 1912 - a momentous day in the history of industrial India. Steel is crucial tothe development of any modern economy and is considered to be the backbone of the†¦show more content†¦This phase,among other things, saw the installation of two 130 tone LD converters, two 250 tons a dayoxygen plants, a bar forging machine, two vertical twin-shaft lime kilns and a tar-dolo brickplant. Significantly, a six-strand billet caster and a 130-tone vacuum arc refining unit wereinstalled, that too in the integrated steel plant. 2.2 COMPANY PROFILE In the 1920s and 1930s, when it was still called Tata Iron and Steel Company, TISCOs largely tribal workers fought pitched battles with the European or Parsi management. Work conditions and the right to organize were important rallying issues, and over the years, the company developed a reputation for union-busting, often by violent means.The value of Dorabji’s Expansion Programme came to be appreciated only during the phase when world was reeling under the pressure of the Great Depression. The Tatas survived the depression and supplied nearly  ¾ of the country’s steel requirements. By the Second World War, Tatas’ production capacities had expanded enough to make their prices lower than those of steel produced in England raising them to an authoritarian position. By the 1980s, the government was clearly in control of what had come to be called the commanding heights of economy. More than 45% of output in organized industry came from the public sector as well as bank and other long-lending institution. In 1981-82, eight of the largest firms in India were in the public sector, as were 24 out of the top 30 inShow MoreRelatedLateral Structures, Organic Systems, And Professional Organizations890 Words   |  4 Pages â€Æ' Table of Contents Introduction 2 Synopsis of lateral structural arrangements and utilization of lateral relationships as legitimate avenues of information for organizations. 3 Different lateral structural arrangements used within organizations that exclude project teams, matrix structures, organic systems, and professional organizations. 4 Formal and Informal Meetings 4 Committees 5 Coordinating Roles 5 Task Forces 6 Self-Managing Teams 6 Network Structures 7 Adhocracy Structure 7 Cross FunctionalRead MoreCase Study of Jones1206 Words   |  5 Pagesdue date. However, be sure to save your updates each time you enter the Checkpoint tab. Be sure to submit your answers when you are finished. Case Study Questions: 1. Provide a synopsis of the Jones and Shephard case. 2. Highlight three enterprise management causes/considerations and three project management causes/considerations for the situation. Include what seemed to be missing. 3. Consider that you are the systems manager who is now responsible for redesigning the organizationalRead MorePrioritizing D.D. Williamson1023 Words   |  5 Pagesfoods and beverages with global operations on five continents since founded in 1865. Over the years, the company has managed to be successful in many business endeavors, as well as withstanding the test of time by being in existence almost 150 years (DDW, 2013). In this time, Williamson has experienced many difficulties but yet has managed to overcome them all and their problem with prioritizing was no different. In this case study, Williamson had trouble managing projects that were successful, so theyRead MoreBus 599 Project Deliverable 5731 Words   |  3 PagesBUS 599 Project Deliverable 5 IF You Want To Purcahse A+ Work then Click The Link Below For Instant Down Load http://www.acehomework.net/?download=bus-599-project-deliverable-5 IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM BUS 599 Project Deliverable 5 BUS 599 Week 9 Project Deliverable 5 Project Deliverable 5: Executive Summary Presentation Due Week 9 and worth 100 points This assignment consists of two (2) sections: a written executive summary, and a slide presentationRead MoreSap : Sap And Sap1395 Words   |  6 Pagesperformance and a synopsis of sales force efficacy are provided to the sales professionals of the companies by this module. Sales planning module This module determines sales target relying on key figures such as quantity, costs, revenue, contribution margin and multiple dimension like product group, helps companies enhance and optimize their supply chain, consolidate companies’ sales planning. Procurement monitoring system It controls applications of companies’ purchase operations. The accurate analysisRead MoreFinancial Management Practices798 Words   |  4 PagesA STUDY ON WORKING CAPITAL MANAGEMENT IN SMES A SYNOPSIS of the PROJECT Submitted to BANGALORE UNIVERSITY For the award of the Degree of MASTER OF BUSINESS ADMINISTRATION SUBMITTED BY Mr. PUROHIT PIYUSHKUMAR N. (08CQCM6068) UNDER THE GUIDANCE OF MRS. KIRAN HIREMATH. Dayananda Sagar College of Management and Information Technology Shavige Malleshwara Hills, K.S. layout, Layout, Bangalore – 560078 Read MoreChapter Seven : Project Management1122 Words   |  5 PagesSEVEN: PROJECT MANAGEMENT 7.0 Introduction A project is a unique set of interrelated activities having predefined goals which must essentially be accomplished by a particular time, within budget and in line with the user specifications. (Artto, K., et. al 2011) This chapter gives an overview on the project management structure that was used to ensure the project success in meeting with its set out goals and objectives and in finding an answer to the set project research question. 7.1 Project ManagementRead MoreNASA Challenger and Columbia Disaster1284 Words   |  5 PagesNASA Challenger and Columbia Disaster Post- Challenger NASA Structural and Cultural Changes The challenger disaster called for certain changes in the NASA organizational structure, culture and operations. The Rogers Commission carried out a full investigation into the causes of the disaster and recommended to NASA certain actions to mitigate future incidents. First of all, there was a creation of a Solid Rocket Motor Joint redesign team who would also analyse the sealing system (NATA TechnicalRead MoreFinancial Trend Analysis Of Tata Steel Ltd Essay1257 Words   |  6 Pages who has provided me the ways and techniques to make this project; even she helped me in finding out the research papers to complete this project. I would also like to give a special thanks to our director Dr. SUJATA KHANDAI who gave me the golden opportunity to do this wonderful project on the topic,† Financial Trend Analysis On TATA STEEL Ltd.† I would also like to thank my parents who helped me a lot in completing this project within the limited time frame. SAMIKSH SHARMA B.Com (HonsRead MorePfm Devices1313 Words   |  6 PagesPFM Devices Complex Project Initiatives MBA 632, fall semester 2011 Synopsis Jeff Goodman was a strong advocate for the product synthetic cartilage, and saw an opportunity to launch a successful company in the medical industry. His vast experience in the medical field helped to successfully create PFM Devices. As of 2002, Goodman, still CEO was looking to extend his product on a global scale. His final initiative before retirement was to increase global market share. It seemed as though

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.